Where We Work
At TES Group Inc., our team members have been involved in numerous projects throughout Western Canada. Below is just a sample of the projects our team has been involved in.
CONSTRUCTION SERVICES
- Assembly and code stamping of one 200 kpph HRSG in cogen application
- SAGD Expansion Project – Equipment, piping, vessel and mechanical installation
- Early works and underground piping, installation on oilsands expasion programs
- EPC Contractor for design & build of 25 MW green power generation facility
- Boiler assembly, including fabrication & installation of piping for the SAGD pilot project
- Assembly of three OTSGs and related feedwater, steam modules, fuel, plant air piping at a SAGD facility
- Assembly and code stamping of one 50 mmBtu/hr duel fuel OTSG for dual fuel at a SAGD project
- Piping, fabrication, mechanical/structural steel installation for an enhanced solvent project on existing well pad
- Construction of four well pads including steam and production piping at a SAGD facility
MAINTENANCE SERVICES
- Annual mill shutdown, piping and maintenance at pulp mill
- Reconfigure floor tubes; install bed floor drains on BFB boiler, evaporator, economizer and piping maintenance at a green power facility
- Repairs to fire-tubed boiler, replacement of several tubes and final testing
- Mechanical and piping construction services for replacement of two HRSG evaporators at a CSS facility
- Assembly and code stamping of two 250 kpph Package Boilers and ongoing boiler maintenance
- Annual mill shutdown, Power boiler repairs, installation of hydrograte seal at kraft pulp mill
- Conversion and rebuild of CFB Boiler to a BFB Boiler including air, fuel and ash systems, ongoing boiler maintenance
- Re-rolling and seal welding of two Package boilers at an oilsand upgrader
- Rebuild and repairs to fire heater in glycol service at a SAGD facility
- Rebuild of two 25 mmBtu/hr OTSGs for THAI process facilities at a heavy oil facility
- Emergency repair of fire-tube boiler, re-welding of tube sheet at a food and beverage facility
- Inspection and repair of HRSG floor casing, waterwall tubes, replacement of superheater elements and ongoing gas plant maintenance
- Demolition and replacement of penstock line in mountain setting at hydro electric generating station
TECHNICAL SERVICES
- OTSG re-rate study and Commissioning & Start-up services
- Supplied 75 API Inspectors for equipment, piping and vessel integrity role on major upgrader turnaround at a upgrader and SAGD facility
- Provided 15-20 IPV/API Inspectors, acting as the owners’ inspection team to support with their Equipment Integrity and Management Program
- Quality control management team completion review of all turnover documents for upgrader commissioning
- WHRB condition assessment & inspection services
- OTSG condition assessment & inspection services
- Rental boiler condition assessment
OUR CUSTOMERS | CHEMICAL & PETROCHEMICAL | GAS PLANTS | MINING & METALS | OILSANDS MINING FACILITIES | POWER PLANTS | PULP & PAPER | SAGD | UPGRADING & REFINERIES |